Hi,欢迎来到验厂之家,选择验厂之家,通过后付款,验厂之家,使命必达!

BSCI验厂,SA8000认证咨询,Sedex验厂,ICTI验厂,Disney验厂,RBA认证咨询,ISO9001认证咨询,苹果验厂,华为验厂等一站式验厂咨询、验厂辅导服务,验厂无忧,通过后付款,让你省心放心,欢迎拨打:400-008-6006!

当前位置:首页 >验厂咨询 > 质量验厂 > GAP验厂 > GAP验厂介绍,GAP验厂质量审核标准(四)

GAP验厂介绍,GAP验厂质量审核标准(四)

1941次 2022-01-13 作者:验厂之家

       GIS QA Technical Evaluation Scope
        CONFIDENTIALITY:  The information, comments and opinions contained in the report including any and all attached photographs, copies of reports and similar documents are for the use of the Gap Inc. business units and its subsidiary companies.  Do not distribute or photocopy this report without receiving prior written consent from GIS VQM department. 

Section

Q no.

Question

Management

管理

1

Factory manager and Department Managers have computerized system to access reports highlighting production output and efficiencies, quality control performance, order status and other essential and helpful data to properly manage factory operations.

工厂厂长和部门经理是否可用计算机系访问或输入产量和效率品质表现订单状态以及其它必要和有利的数据,根据这些信息来妥善管理工厂的运作。

Management

2

Management has an internal system to work with their suppliers on evaluation the material quality performance and work out pro-actively to prevent raw material/trim/semi-product quality issues.

是否有一个内部管理系统与供应商一起评估物料品质性能防止原材料/辅料/半成品质量问题发生?

Management

3

Are there qualified and enough DA available and can be appointed for full empowerment under all necessary criteria's that we required as per DA manual? E.g.. Camera, desktop computers, WIP information, MRP preparation etc.

是否有足够及合格的DA ,在所有必备条件的前提下能够授权提供我们所要求的? 如:照相机、台式电脑、WIP信息、MRP准备计划等?

Management

4

- Is there merchandiser on site who can perform translation of all English documents to local language correctly and promptly?

现场的业务员是否能准确及时地所有英文资料翻译成中文?

Management

5

What is the quality mind set of the factory management staff and their reaction when there is a CAP / suggestions during the visit?

工厂的管理人员在访问期间提出的问题有什么改善行动或建议?

Management

6

There is proper planning/hiring/ training for all the merchandisers / supervisor / DA / workers including documentation/ technical / Mansell eye testing / Color-blindness test to ensure they are qualified for the job assigned to meet buyer order requirement consistently.

是否合理的招聘和培训计划,在资料文件方面培训所有的业务员/主管/DA/工人同时也要对他们进行视力测试/色盲测试,确保他们能胜任所在岗位工作,同时始终满足客人订单要求?

Section

Q no.

Question

Sweater - Yarn

1

Is the winded yarn in correct threading, tension and pass wax evenly and consistently on similar weight and circumference across all cones with clear label?

Sweater - Yarn

2

Is there procedure in place to ensure that white and light shaded yarns are kept separate from dark colors on winding heads and divided sections are available to separate winding of white and light shaded yarn from dark colors?

Sweater - knitting

3

Do all works have the approved written procedures explaining the knitting sequence and the amount of weights required for each style, coarse/inch, wale/inch, panel width and weight (for hand frame machines)? Are the automatic knitting machines properly set (for auto machines)?

Sweater - knitting

4

Is in-line inspection conducted on panels, for basic measurement and general quality, such as holes, etc.?

Sweater - knitting

5

Are inspection area well organized and well lit (800+) lux?

Sweater - knitting

6

Are there controls and markings in place to ensure shade consistence of same piece garment?

Sweater - knitting

7

Is there knitting tension checking with machine? How freq is it checking with record? Is there machine used for tension checking?

Sweater - knitting

8

Is there checking of linking yarn strength before release to workers?

Sweater - knitting

9

What is the ratio of table checker vs. linking workers? Is it 100% check and mend before washing?

Sweater - knitting

10

What is the ratio of light tube checking vs. linking workers before washing? Is it 100% check?

Sweater - mending

11

Is the ratio of the Mending/ Stitching workers to Linking workers appropriate based on the production and the complexity of the styles? (Line balancing).

Sweater - mending

12

Are Mending/ Stitching worker skillful?

Sweater - mending

13

Is there effective 100% check after mended garment? Is the mending and checking separately by different workers?

Sweater - mending

14

Are mending sections well organized and well lit (800 or above) lux?

Sweater - mending

15

Is there needle control process effectively monitoring?

Section

Q no.

Question

Add#2 Product

Safety

1

Is there appointed Product Safety Officer (PSO) checking 100% production site in monthly basis and submit GIS Product Safety Compliance Checklist as per GIS requirement?

Add#2 Product

Safety

2

Is metal free zone under well control in sample room, the whole production floor and QC room?

Add#2 Product

Safety

3

Is there regularly checking and maintenance of the mold and machine for snaps/rivets…etc. so factory ensure 100% that the molding process is compliance?

Add#2 Product

Safety

4

Is broken needle log checked, verified and maintained the records properly?

Add#2 Product

Safety

5

Is Pull Test equipment available and correctly performed to test the attachment strength of snaps/rivet/ small parts?

Add#2 Product

Safety

6

Is Needle Detector function correctly and correctly performed by 9 point checking and record complete 3 times per shift?

(1.2 mm sensitivity)

Add#2 Product

Safety

7

Is the metal free zone properly controls of all metal/tools/ hard tag with limited authorizes person to enter?

Add#2 Product

Safety

8

Is Button Control Procedure checked, verified and maintained the records properly?

Section

Q no.

Question

Add#3

Printing/Plating

1

Are buyer's approved samples/Tech Pack/ trim cards provided as guides for operators?

Add#3

Printing/Plating

2

Is printing/plating automatic or manual ( including drying) and machines/spare parts in correct setting, well maintained and clean?

Add#3

Printing/Plating

3

Are screens made in-house or contracted to outside source?

Add#3

Printing/Plating

4

Is there organized and controlled storage area for chemicals and MSDS sheet display and all the workers well trained to follow the SOP accordingly?

Add#3

Printing/Plating

5

Are in-process and finished pieces inspected in hourly basis in enough lighting to ensure consistency in Print Quality ?

Add#3

Printing/Plating

6

How are seconds replaced before releasing back to production workflow?

Add#3

Printing/Plating

7

Is the working  environment/ housekeeping  /tray/ racks/ trolleys/ tables/aisles clean and tidy?


Section

Q no.

Question

Add#4

Embroidery

1

Does the factory have adequate embroidery machines to fulfill the overall production capacity?

Add#4

Embroidery

2

Are embroidery machines properly maintained, regularly cleaned and serviced, and in good working condition?

Add#4

Embroidery

3

Are in-process and finished pieces inspected and seconds replaced before releasing back to production workflow? Are there proper control of deviations per load?

Add#4

Embroidery

4

Is thread SPI/tension well monitored and controlled, and thread ends properly trimmed?

Add#4

Embroidery

5

Does the embroidery facility have a broken needle control process and are all outgoing panels checked?

Add#4

Embroidery

6

Is there visual checking 100% and separate packed per shade in enough lighting when needed?

Section

Q no.

Question

Add#5 Laundry

1

Is laundry capacity adequate in needed machine type to effectively support the overall production output?

Add#5 Laundry

2

Are machines adequately maintained so no steam/water leakage, no rusting or broken parts?

Add#5 Laundry

3

Is there checking of machine temp and RPM with record? Is there infra-red temperature checking device available?

Add#5 Laundry

4

Any calibrated measuring devices used? E.g. weight, beaker

Add#5 Laundry

5

Are laundry formulas, buyer approved samples in shade/hand feel & Tech Pack readily available for operators' and inspector's easy reference?

Add#5 Laundry

6

Is laundry managed by qualified technician / chemist?

Add#5 Laundry

7

Does laundry follow GAP PH & Crocking SOP? E.g. incoming water control, washing receipt control, testing of result, separation of wash lot, test per wash lot …etc.

Add#5 Laundry

8

Is there 100% visual/shade checking in correct light source and separately packed to return to next bulk process?

Add#5 Laundry

9

Is there measurement and hand feel checking per machine load with record?

Add#5 Laundry

10

Is there light box with buyer required light source available?

        如也有不清楚的可以随时在线留言,我们致力于验厂咨询.认证体系辅导服务多年,累计帮助上万家知名企业顺利通过各种各样验厂和体系认证辅导。为广大客户提供一站式服务,机构遍布全国,无论是国内还是国外,都有我们公司的各个地区的辅导机构,且社会经验丰富,老师专业,拥有诸多的人脉关系,可以为工厂提供高性价比的服务,避免找不到方向,让制造厂安心、快速顺利通过验厂和认证审核。

上一篇:GAP验厂简介,GAP验厂项目、GAP验厂审核内容及注意事项下一篇:GAP验厂介绍,GAP验厂质量审核标准(三)
验厂培训机构

团队专,服务专

一对一,专业服务

sedex验厂咨询

响应快,定稿快

撰写高效,递交快捷

sa8000认证机构

质量好,保密好

授权率高,安全性强

icti认证辅导

省费用,省心力

全程托管,进度可查