GAP验厂介绍,GAP验厂质量审核标准(二)
GIS QA Technical Evaluation Scope
CONFIDENTIALITY: The information, comments and opinions contained in the report including any and all attached photographs, copies of reports and similar documents are for the use of the Gap Inc. business units and its subsidiary companies. Do not distribute or photocopy this report without receiving prior written consent from GIS VQM department.
Section |
Q no. |
Question |
PP meeting 产前会议 |
1 |
Is there a completed MRP / QC file for each style? 每款产品是否都有完整的MRP/QC文件? |
PP meeting |
2 |
Is size set sample per color way prepared and reviewed in measurement, visual, fitting, testing and related performance test with report for bulk adjustment? 是否每个颜色的跳码样都要检查尺寸、外观、试身和测试并有记录为大货做修正参考? |
PP meeting |
3 |
Is material and trim test report reviewed and discussed for bulk production and quality control procedures? 是否有评估和讨论物料及辅料的测试报告,给大货生产和品质控制做参考? |
PP meeting |
4 |
Does the factory using engineers/technician to set production goals and targets for the Sewing lines, is the workplace and machine work aids set-up of the most efficient and workflow and ergonomics? 工厂是否让工程师/技术员为每条生产线设定产量目标?车间和机器装配从生产流程和人体工程学方面考虑是否最为有效? |
PP meeting |
5 |
Who attend the PPM and how the PPM report pass to them? 谁会参加产前会议?怎样把会议记录传达给他们? |
PP meeting |
6 |
Is there a certified FKR? (NA for new factory) 有无认证的工厂检查员?(新工厂不适用) |
Section |
Q no. |
Question |
Cutting 裁剪 |
1 |
Check if there are proper control of pile height for cutting? 是否有检查拉布高度? |
Cutting |
2 |
Check if the production marker with panels are properly laid flat, overlapped with proper special marker, cut by pieces using appropriate scissors/ band knife/ die cut/ lazar cut…etc.? 有无检查唛架是否正确的平辅,是否有重叠和标记,使用适当的剪刀/带式刀/打孔机等? |
Cutting |
3 |
Is there proper control for matching / cutting of patterned fabrics such as plaids & stripes? (Only for plaids/ stripes) 裁剪时是否合理控制条字布和格子布使其对条对格? |
Cutting |
4 |
Is spreading methodology is found with appropriate tension; stretch /knit fabric relaxation process correct, PU and leather in correct shading separation, suitable controlled environment condition for relaxation/ temporary storage ? 是否使用适当的力来拉布以避免张力,针织布的松布程序是否正确,PU和皮革是否正确的分开色差,是否在适当的环境松布,松好的布是否储存在受控区? |
Cutting |
5 |
Is there roving QC checking cutting accuracy? QC有无检查裁剪的精确度? |
Cutting |
6 |
Are cut pieces properly inspected and numbered? 裁片有无检查和编号? |
Cutting |
7 |
Does factory has good housekeeping on leftover fabric/ cut panels/ waste fabric? 对每匹布裁剩的布尾有无很好的记录和保存,以备配片之需? |
Cutting |
8 |
Is there work-in-progress balance between cutting and production output to adequately fulfill daily production requirement? 是否有衡量裁剪和其他生产过程的产量足以达到日产能要求? |
Cutting |
9 |
Indicate fusing method used? - Hand Iron , trouser steam press, small piece fusing press, continuous roller fusing press. 烫衬用的是熨斗、蒸汽压力机、小的熔化块还是滚筒式熔化机? |
Cutting |
10 |
Is fusing quality acceptable, machines regularly calibrated and records maintained? 烫衬质量是否可接受,机器是否定期较准和维护并保存记录? |
Cutting |
11 |
Are bulk cut goods and trims, designated for either internal or off-premise handling (such as sewing, laundry, embroidery, printing), transported in a well-organized and protected manner? 在内部或外部处理(如缝制、水洗、绣花、印花)的产品和辅料在转送或运输过程当中是否有序且受到保护? |
Cutting |
12 |
Is there metal/ needle control policy implemented? 是否实施金属和利器控制程序? |
Cutting |
13 |
Are all machines in good conditions/ setting and maintenance? Wiring? 机器是否状况良好并定期维护? |
Cutting |
14 |
Is the molding process in consistent setting and operating?
|
Section |
Q no. |
Question |
Sewing/ Assembly 车缝/装配 |
1 |
Are approved samples & trim card available on every line for review, and sample comments translated into local language? 封样和物料卡是否挂在每条生产线上供参考,封样意见有无翻译成中文? |
Sewing/ Assembly |
2 |
Are in-house pre-production meetings scheduled for each style, prior to bulk production, and meetings attended by relevant factory personnel? 是否在大货生产前召开内部产前会议,各相关部门是否都有参加? |
Sewing/ Assembly |
3 |
Are pilot runs conducted prior to bulk production with record ? What is the action taken for pilot runs that do not meet our standard? 在开始生产前是否先做试生产并有记录,达不到客人标准时会采取什么行动? |
Sewing/ Assembly |
4 |
Is there enough capacity against information provided? Check if there is balance of lines across all operations. E.g. line balancing. 是否有足够的产能,检查所有生产线安排是否平衡? |
Sewing/ Assembly |
5 |
Does the factory have system in place to plan, monitor, and track daily production output? E.g. bundle/pcs/ bar code/ digital display/white board 工厂是否有系统计划、监控和追踪每天的产能?(如通过装箱数/条形码扫描/电子显示屏/白板) |
Sewing/ Assembly |
6 |
Are there on site mechanics/electricians who regularly maintain all machines and maintenance records well-kept in daily basis to ensure correct machine setting/ proper lubrication, spare parts, attachments, working aids, wire setting? 现场是否有机修工/电工对机器进行日常维修和保养并有记录,以确保机油充足、机器配件运作正常? |
Sewing/ Assembly |
7 |
Is there proper maintenance department equipped with adequate tools and necessary equipment to support and make trolley, side table, tray, support shelf, rack, pulley, roller……etc. 是否有正规的维修部门并配有充足的工具给予支持? |
Sewing/ Assembly |
8 |
Is there efficient pre-pressing procedure / marking in correct template to ensure the product shape consistency across whole bulk? 是否设有中烫,用点位标记的方法确保所有大货形状一致? |
Sewing/ Assembly |
9 |
Do inline/roving QC check overall workmanship at different operations, especially at critical operations with follow up actions and record? 巡查和抽查QC是否检查每道工序的工艺?特别是关键工序需要有跟进行动并做记录 |
Sewing/ Assembly |
10 |
What is the ratio of end line QC/QA vs direct sewing operator? 成品QC/QA与车缝操作员的比例是多少? |
Sewing/ Assembly |
11 |
Are adequate systems used to separate defective and /or good products? 是否有足够的系统来区分次品与良品? |
Sewing/ Assembly |
12 |
Is there a proper product safety system to record broken/damaged needles, scissors, thread cutters, tag gun needles & hand stitching needles etc., at both sample room and production floor? 是否有产品安全控制程序记录板房和生产车间的断针/损坏的针、剪刀、枪针、手缝针等?
Remark for 3: No spare needle, worn and replacement needle held by the operator OR left in production areas; it is verified that factory has already setup the needle control procedures in all areas, including production and sampling (i.e. |
Sewing/ Assembly |
13 |
Is production floor well organized, clean, aisles clear, free of clutter with good ventilation? 生产楼层是否整洁、干净、通道干净、通风良好? |
Sewing/ Assembly |
14 |
Is there a proper training program for new operators? 是否有新员工上岗培训计划? |
如也有不清楚的可以随时在线留言,我们致力于验厂咨询.认证体系辅导服务多年,累计帮助上万家知名企业顺利通过各种各样验厂和体系认证辅导。为广大客户提供一站式服务,机构遍布全国,无论是国内还是国外,都有我们公司的各个地区的辅导机构,且社会经验丰富,老师专业,拥有诸多的人脉关系,可以为工厂提供高性价比的服务,避免找不到方向,让制造厂安心、快速顺利通过验厂和认证审核。
便捷链接: HBI验厂EcoVadisEcoVadis认证咨询化妆品验厂化妆品认证咨询GMPC验厂GMPC认证咨询RCS认证咨询NBCU验厂AEO认证咨询AEOInditex验厂Huawei验厂华为验厂PVH验厂ESD认证咨询ESDFSMAFSMA认证咨询小米验厂验厂之家APPLE验厂苹果验厂WRAP认证咨询WRAP验厂WRAPEICCICTI验厂ICTI认证咨询ICTISA8000认证咨询迪士尼验厂disney验厂Walmart验厂沃尔玛验厂认证咨询验厂BSCI验厂BSCIWalmart认证咨询WCA验厂CVS验厂RBA验厂RBA认证咨询GRS认证咨询Huawei华为验厂劳氏反恐验厂Nike验厂Lowe's验厂McDonald验厂LOREAL验厂家乐福质量验厂QSA验厂ISO9001FCC认证咨询ISO14001服务体系认证咨询产品体系认证咨询管理体系认证咨询反恐验厂质量验厂社会责任验厂EICC验厂ICTI 验厂OHSAS18001认证咨询
本文来源:验厂之家 - GAP验厂介绍,GAP验厂质量审核标准(二)
版权说明:上述为转载或编者观点,不承当任何法律责任